Which is great ! :-)
I am going to try and get as much as I can done on the Hull before now and then as no doubt I wont have much spare time come September.
Still I am not going to rush it and ruin it if it takes ten years then it takes ten years.
.jpg)
.jpg)
.jpg)
The planks were all cut to 80mm.
.jpg)
.jpg)
.jpg)
.jpg)
After cutting off the protruding hull formers above the deck level, I then proceeded to plank the inside of the hull as this was still lime, this made the ships sides very strong as it was now three layers thick (Walnut outside/ Lime centre/ Walnut inside)
The 4 decks were all planked using a 3 butt shift pattern, this took a surprising amount of time but very rewarding.
The handrails were then fitted and glued into position, and pins that had been made earlier using a electric drill and file (see photo below) were applied to the corners, this looked nice as well as added some strength.

So renovating the house was now finished (after 2 years) and it was time to start the boat again, it took me a good few hours to familiarise myself with where I was in the build.